Notes from #MetaBrainz Meeting 2024-01-15

#MetaBrainz Meeting 2024-01-15

Meeting start: IRC Logs for #metabrainz | MetaBrainz Chatlogs
Meeting wiki page: MetaBrainz Meeting - MusicBrainz Wiki

Agenda

Last meeting: 2023-12-08
Next meeting: 2024-01-22

@reosarevok: It’s Monday again! Welcome everyone
Since I just signed a new contract, I don’t need to bother coming up with new jokes. I’ll make an effort again in December

Reviews

[quote = “rob”]
[mayhem] last week was the worst week of the year, as expected. accounting, invoices and lots of cleanup on the accounts from the past year and filing paperwork needed
but I also made a budget for the upcoming year and proposed raises for the whole team.
the board signed off on it and today I sent out contracts.
I also updated the “loss of executive director” document and changed the master password on the password vault
new partial keys have been distributed to 5 people.
and then I started off working on the MB documentation improvement project with rdswift and reosarevok.
oh, and loads of PRs against the lb-content-resolver last week.
that was really rewarding. : )
[/quote]

[quote = “CatQuest”]
[ApeKattQuest] Updated cornamuse and crumhorn
and did INST-1103: cornemuse aka cornemuse du centre (somehow)
Griped a whole lot about jira and general life crap :smiley:
but in other news I’m working hard on instruments again (nothing else to do now as the temperature is -10 to -18 this week again!)
[/quote]

[quote = “reosarevok”]
Last week I spent a lot of time dealing with user reports
Triaging a bunch of stuff I has left from the Christmas break
Bits of code review
And merging some PRs
Plus we had some discussions with the team about search, but turns out lucifer already did most of what we wanted it seems : D
[/quote]

[quote = “lucifer”]
last week, i tried to setup bridges between IRC/zulip/discord/matrix. only the discord one worked/
rest two hit technical snags, hope to get it working this week.
did some final fixes for YIM. and a little progress on MeB OAuth stuff.
other than the search stuff mentioned already, tested and it works smoothly in development on sample data. need more testing on the full database to confirm
but otherwise we should be ready to move to Java 17 and Solr 9 in prod soon.
Lucifer Morningstar also, got sir working on python3 again. bitmap was able to reproduce that it works
[/quote]

[quote = “mr_monkey”]
[monkey] I was sick most of last week sos didn’t get much done.Towards the end of the week I started going at my pile of PRs to review, and looked into a BrainzPlayer issue on LB.
[/quote]

[quote = “pranavkonidena”]
I started fixing stuff on YIM
Mostly the foxes are done.. would love to start picking up on LB IOS for the future
Would get to learn swift so excited for that
[/quote]

Discord Bridge

IRC alternatives

Topic carried over to next week’s meeting.

Summit 2024

No objections to having the summit in Delhi.
The summit will be on the week of 23 September
Non-India attendees to arrive 3am on the 21st of September, and to fill out a form re. when they want to leave.
Full topic discussion in the log.

absent: akshaaatt (2) Pratha-Fish/snaekboi (1)

3 Likes